Link-systems OmniLink II Press Automation Control Instrukcja Użytkownika Strona 13

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 154
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 12
August 30, 2002 Manual Version 1.0
2.4
Section 2.2 Mounting System Components
Section 2.2.1 Mounting the Operator Terminal Enclosure
The OmniLink II LCD Operator Terminal must be mounted in a position that is easily seen and accessed
by the operator. The liquid crystal display is designed for optimum viewing from the bottom of the
display. If the operator terminal is mounted in a vertical plane, it should be mounted slightly above the
operator's eye level for best visibility. If mounted in a sloped position, it should be mounted so that the
operator's line of sight is from the bottom of the LCD. The desirable orientations are shown in Figure
2.4.
Figure 2.4 LCD Mounting Orientations
The OmniLink II Press Automation Control operator terminal is usually furnished mounted on the front
of an enclosure, which also contains the R/D-Brake Monitor Module mounted in the back of the
enclosure and pre-wired to the operator terminal. Figure 2.5 gives the dimensions of the operator
terminal enclosure, including mounting dimensions.
Przeglądanie stron 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 153 154

Komentarze do niniejszej Instrukcji

Brak uwag